Click On Any Photo To See Large Version
Use Your Back Button To Return |
|
Cumbres & Toltec Chief Dispatcher Ronnica
Lopez, what a smile!!! |
|
Locomotives 488 and 484 at Cumbres. |
|
Locomotive 488 comes up to pass 484. |
|
I am on 484 at Cumbres and we are waiting just to
the side as the the train switches. |
|
The Freight train passes locomotive 484 at Cumbres
on the triple header special. |
|
Cumbres & Toltec locomotives 487 and 484..
Locomotive 487 will receive a major rebuild this winter, I will keep
you informed on the work. |
|
Locomotive 487 comes up to pass 484, 487 and 488
will head to Osier to bring the train back.. |
|
Locomotive 484 holds the siding into the Wye. |
|
The Triple Header has arrived at Cumbres, I am in
484 and you can see 487 smoking and 488
venting steam at the back. |
|
Here comes 487 swinging in the middle as a helper. |
|
I love the stock cars behind me... |
|
Looking back on the triple from the lead
locomotive.. we are about to pass Windy Point. |
|
The Antonito Water Tank, for the first time
in its lifetime, it is still full of water into december.. made for
some cool icicle's. |
|
It was a very cold day, but both trips went
well on the Christmas Trains out of Chama. |
|
You can see the extent of uphill progress that
day. |
|
The Headlight lights up the steam exhaust as 487
waits for Santa Claus to board the train. |
|
Cumbres & Toltec locomotive 487 at Dalton. |
|
Good Ol'e 487. |
|
The Train consisted of Max and "Gorilla" on the
train, with Marvin from the road as support, Ronnie and I and Jose
in the Cab.. Stephen brought out a grill and stocked the snack car
and even had hot chile and burgers and hot dogs for the passengers. |
|
We ran two trains for Christmas and 487 was the
power, I love how the steam was illuminated by the glow of the
headlight. |
|
Cumbres & Toltec Locomotive 487 ready for two
Christmas Trains out of Chama for 2007. |
|
After this run, locomotive 487 was shut down and
will be stripped for a major rebuild, repairs to side sheets, flues
and staybolts and a complete rebuild of the cab interior.. |
|
We had a great time, but it made for a long
day.. we arrived early from Antonito to clean the fire, coal and
water the locomotive and the drive home to Antonito took us almost
3 hours due to blinding snow and white out conditions.
|
|
Ronnie and Jose are in cab.. |
|
There will actually be three of us in the cab
today for safety.. we will in places have to plow snow, the more
eyes the better!
|
|
Cumbres & Toltec locomotive 487. |
|
I love this shot, steam in the winter is a
beautiful thing.. |
|
Locomotive 487 pulls the train up to the loading
area... |
|
Locomotive 487 is steaming up the yard.. |
|
Looking good, very cold, but looking great!! |
|
I love how the headlight lights up the steam... |
|
Another day of steam railroading on the Cumbres &
Toltec. |
|
Everybody is dressed for cold weather railroading. |
|
We have hooked up 487 and will spend 10 minute's
or so charging the train. |
|
Ronnica and I in the Chama Depot.. |
|
The Antonito Tank has a collection of Ice on it.. |
|
Cumbres & Toltec locomotive 484 in the Chama
Shop. |
|
I will follow 487 thru its rebuild..keep your eyes
open. |
|
Looking at the work on 489. |
|
From the left, locomotive 484, 489 and 487. |
|
Locomotive 487 after pulling the Christmas train
is in for major repairs.. |
|
484 in the shop. |
|
Cumbres & Toltec locomotive 484. |
|
All three locomotives in the shop.. |
|
I worked on these a little bit on my camera and
they came out alot better. |
|
Locomotive 489 in the Chama Shop, I think its
going to be ready for a boiler hydro test soon. |
|
Ice on the Antonito Water Tank... |
|
Okay 85 ties have been installled, we dumped
4 cars of ballast and now the Tamper and Regulator will come to do
their job. |
|
We dumped downhill from the west switch.. its
pretty steep I had to tie down the handbrakes on the ballast cars
just to keep them under control on the downgrade. |
|
We will use the connecting track to turn the
Christmas trains and so we are going to ballast the track after the
track crews replaced 85 ties between the switches. |
|
Diesel 19 is at Lava Loop, We are going to dump
ballast here to rebuild the connecting track. |
|
Doesn't that look cool, I mean really
cool!!! |
|
We plan to have the track done soon as we
plan to turn the entire Christmas Train at Lava. |
|
The track crew replaced 85 ties at the Lava
Connecting track and now we are going to dump ballast. |
|
We are going to haul ballast to the connecting
track at Lava Loop. |
|
Early morning, beautiful light and Diesel 19,
Joseph and I are loading ballast. |
|
Loading the rock at our loading spot.. |
|
Diesel 19 with two ballast hoppers, ready to roll
in the Antonito Yard. |
|
The Antonito Tank is bathed in Ice! |
|
Cumbres & Toltec Dispatcher Ronnica Lopez,
all the ladies from Antonito came over to Chama to run the depot for
the Christmas Train. |